Bathroom remodel · Free estimate sample

Bathroom remodel estimate template

The general shape of a bathroom remodel estimate. Demo, plumbing and electrical, tile and waterproofing, fixtures, and finishes kept separate so the customer sees that the tile is a fraction of what makes a bathroom work.

Use this template in the app Sample document · illustrative figures only · no signup
Estimate #5656
Sample Remodeling Group · Sample date
Valid 30 days
Demolition and disposal$1,200.00
Plumbing and electrical rough-in and finish as described$3,800.00
Waterproofing, tile, and shower or tub installation$4,500.00
Fixtures — toilet, vanity, faucet, shower valve — allowance or as specified$2,500.00
Drywall, paint, flooring, and trim as described$1,900.00
Total$13,900.00
Excludes: structural changes, window replacement, asbestos or lead abatement, and conditions discovered after demolition beyond the stated allowance. Fixture selections at stated allowance; overages billed at cost plus stated markup. Payment due on completion.
Sample template only. Company, figures, and scope are fictional and for illustration — not a quote, price guide, or market rate.

Common practice

Why it's written this way

Bathroom remodels fail at the waterproofing and get argued at the fixtures. The estimate should address both.

1

Why is waterproofing grouped with tile?

Because it's what the tile is sitting on. A combined line stops a customer from comparing a tile-only bid against a full shower rebuild.

2

Why a fixture allowance?

Fixtures range from cheap to absurd. An allowance sets the budget and lets the customer choose without re-quoting.

3

Why exclude post-demo conditions?

Rot under the old tub is common. Excluding it beyond an allowance makes it a priced change.

Before you send it

What varies by state

Bathrooms trigger permits and licensed trades almost everywhere.

General information, not legal, tax, or licensing advice. Requirements differ by state, county, and city and change over time. Confirm with your state licensing board and the local authority having jurisdiction before relying on any of this.

Estimator notes

Common questions

Should I break out tile from waterproofing?

Keep them together on the estimate; itemize on the invoice if the customer asks.

How do I handle the vanity?

Allowance. Customers change their mind on vanities more than anything else.

What if I find rot?

Exclude beyond the allowance, photograph it, and price the change.

How long is the estimate valid?

30 days.